Was warm and 12 degrees today, so I got the 22 ready for shrink wrap.
Got all the cushions and sails out to go home.
Got the bilge vacuumed out.
Fashioned a piece of wood to go into the gungeons to support the mast as ridge board, and added PVC conduit as ribs.
Got the strings all set to take the shrink wrap.
Unfortunately we ran out of shrink wrap doing Peter's Sumac and Walter's Wind Song.
Will pickup some more material this week to do ACE, Impromptu, Still Time, and Luff Affair next weekend.
Unfortunately I can't find the key to unlock the motor, so it may stay on the boat for the winter!
No comments:
Post a Comment