On the weekend it was sunny and warm (high 7 degrees C) with not much wind.
Got the frame up on Saturday, and the shrink wrap on with the help of dockmate Scott.
However, the Shrinkwrap gun was in use on Razorbill, so I used it on Sunday to complete it.
Laying the shrinkwrap on |
Starboard folded under strings |
Starboard shrunk |
Port framework |
Port folded under strings |
Port shrunk |
This shows; the framing well using the mast as a ridge pole |
Stern wrapped |
Stern shrunk |
Little Still Time is ready to hibernate.
No comments:
Post a Comment