Haulout for the west yard is tomorrow morning.
Little Still Time is the only boat with its mast up on dock 8:
Haulout for the west yard is tomorrow morning.
Little Still Time is the only boat with its mast up on dock 8:
![]() |
| Reefed Main Driving nicely |
![]() |
| Dodger/Bimnini too |
Haulout for the 34 is on Sunday.
Still plan on taking the mast down on Wednesday before it turns cold and wet on Thursday.
Nothing worst than taking sails and canvas off when wet and cold!
Plan to get out again tomorrow before stripping the boat!
Rita and I got some stuff off the boat before I headed out singlehanded:
![]() |
| Rita on the dock |
![]() |
| Kinda hard to see the plane |
Haulout is 5 days away, and the wind was blowing from the north 9-20 knots: time to go for a sail!
Packed up the winter cover for repair for Phil at the club to patch. The cover is wearing thin along the top where the ridge pole goes. Phil is going to sew some material along the entire length to extend the life of the cover.
Installed the cleaned out water strainer for the deckwash and installed a new hose while I was at it.
The deck wash is working perfectly now.
Went out singlehanded rigging a reef in the main in the harbour, unfurling the jib exiting the harbour.
It was a little cold, but nothing that a few layers of clothing couldn't help with.
![]() |
| Reefed main |
![]() |
| Full jib |
Made it past Ajax, and it looked like rain clouds coming my way.
Before I tacked, I saw that the shackle on the main sheet had come loose:
ZAMBONI haulout is less than 2 weeks away.
Time to get the mast down.
Phil and I got to the boat at around 3pm and proceeded to remove:
Phil and I did some measurements with a long tape measure.
We will use these to create asym tack strop (use the pole downhaul to adjust), and figure out our code 0 and potential fractional asym.
Kris and Michael came and we moved the boat over to the masting area for 5:30pm.
John Crawley was there to do measure the boat for ORC/IRC ratings.
In the above photo, the spinnaker pole on the lifelines was used as a reference to measure the distance from the shear to the black band on the mast to determine the height of the main above the shear line.
The mast came down very quickly.