On Friday, Michael and Phil enlarged the mast hole to accommodate the enlarged mast partner casting.
They had to dig out some rotten balsa core and replace it with some closed cell foam buttered up with some thickened epoxy.
Michael, Phil, and I got down to NYC around 10 to make sure the repair had cured.
We got the mast prepped, installing lines, windex, wind instrument, and such
We got the mast up very quickly (a total of maybe 15 minutes).
We spent the next several hours:
- tuning the rig
- running lines back
- rigging backstay
- running backstays
- mainsheet
- boomvang
Still lots to do before we can sail her.
We had a nice lunch in the NYC clubhouse.
No comments:
Post a Comment