Getting ready for haulout in 2 days!
Went to Home Depot and got some foam board adhesive ($7 a tube):
Next I blocked the cradle to support the keel:
Probably not required, but I don't want the cradle to bend when 12,000 lbs of boat is lowered on it!
Scott and I dropped the mast on the 22.
34 on left 22 of right |
Spent a couple of hours power washing the 22.
Walter and I got the masts broken down and moved over to the mast racks.
No comments:
Post a Comment